THHEAVY 7206
OVER VALUE

THHEAVY 7206

RM0.09

(9 customer reviews)
52 Weeks Range : 0.04 - 0.145

5 day volume Average = 6,625,080
20 day volume Average = 6,006,260
90 day volume Average = 6,623,838
Add to wishlistAdded to wishlistRemoved from wishlist 0
Add to compare
1.9/10 (Expert Score)
Stock is rated as #29 in category BM Energy
Sell Recommendation. Current price is fairly valued.
Prospective Profit
2.243
Assets
0.287
Dividend/ Cash
0.000
Liquidity
5.213
PROS:
  • High Trading Liquidity
CONS:
  • Poor Income Near Future
  • No Dividend Declared
  • Very Low Price-to-Tangible
  • High Debt Company
  • Very High Gearing
  • Face Stock Dillution

klse: TH Heavy Engineering Bhd


Corporate Information

Board   : Main

Shariah : Shariah Compliant

Sector   : Oilfield Services Crude Oil

Address: Level 7, Menara Milenium, Jalan Damanlela, Pusat Bandar Damansara, Damansara Heights, 50470, Kuala Lumpur

Contact: +603-20849000

Website: https://www.thhe.com.my
 

Corporate Background

TH Heavy Engineering Berhad. , through its subsidiaries, fabricates offshore oil and gas related structures. The Company’s core activities include fabrications of major steel structures, engineering, and offshore marine services.

Forecast: THHEAVY 7206

Number of Share

1, 121, 470, 796

Market Capital (RM)

95, 325, 018

Forecasted Profit or Loss (RM)

-215, 168

Estimated Future EPS (sen)

-0.011

Perspective P/E ratio

-775.26

Estimated Dividend Yield (%)

0

Adjusted NTA (RM)

0.034

Result

Quarter Report History

Date Revenue,k PBT,k Net Profit,k
30/06/20 18,937 1,779 2,502
27/02/20 22,072 1,494 2,612
27/11/19 12,017 2,296 2,669
29/08/19 11,937 4,189 4,614
31/05/19 11,530 2,058 2,484
27/02/19 2,177 3,037 907
23/11/18 79 100,239 100,760
30/08/18 143 -217,631 -89,480
25/05/18 186 -25,548 -14,752
27/02/18 352 -37,972 -29,409
30/11/17 416 -35,919 -32,152
23/08/17 2,383 -17,853 -16,794

Fundamental

Fundamental Analysis

Last 4 Quarter Revenue (RM’000) 64,963
Last 4 Quarter Net Profit (RM’000) 9,633
Last 4 Quarter EPS (sen) 1.1
Last 4 Quarter PER 9.9
Last 4 Quarter Dividend (sen)
Last 4 Quarter Dividend Yield (%)
Net Tangible Assets (RM) 0.06
Goodwill (RM) 0
Cash (RM’000) 26,550
Debt (RM’000) 138,660
Total Debt (RM’000) 432,090
Net Assets (RM’000) 66,910
Current Ratio 0.19
Quick Ratio 0.19
Cash Ratio 0.07

Technical

Technical Analysis

MACD (26 vs 12) 0.001
Exponential Moving Average 5 0.088
Exponential Moving Average 20 0.085
Exponential Moving Average 90 0.082
Relative Strength Index 14 0.55
Stochastic %D 3 0.67
Stochastic %K 14 0.67

9 reviews for THHEAVY 7206

2.0 out of 5
0
1
2
1
4
Write a review
Show all Most Helpful Highest Rating Lowest Rating
  1. Investing Malaysia

    THHEAVY is forecasted to made loss of 10.53 millions, with an adjusted market capitalization of 194.83 millions

    Helpful(0) Unhelpful(0)You have already voted this
  2. Investing Malaysia

    Stock code of 7206 in Bursa Malaysia did not propose any dividend for the past few years

    Helpful(0) Unhelpful(0)You have already voted this
  3. Investing Malaysia

    TH Heavy Engineering Bhd gets a score of 0 in our stability test after the balance sheet, money statement study

    Helpful(0) Unhelpful(0)You have already voted this
  4. Investing Malaysia

    THHEAVY gets a score of 0 in our equity and assets quality test based on current share price of RM0.12

    Helpful(0) Unhelpful(0)You have already voted this
  5. Investing Malaysia

    Average investing volume for TH Heavy Engineering Bhd in the past three months in stock market was 8561k lots

    Helpful(0) Unhelpful(0)You have already voted this
  6. INVESTING MALAYSIA

    THHEAVY (14 JAN 20) TH Heavy Engineering Bhd (THHE) has received the green light from Petroliam Nasional Bhd to supply certain products and services to oil and gas companies in Malaysia, after a multi-year suspension due to non-performance in 2016.

    Helpful(0) Unhelpful(0)You have already voted this
  7. INVESTING MALAYSIA

    THHEAVY Boustead Heavy Industries Corp Bhd (BHIC), Destini Bhd, Muhibbah Engineering (M) Bhd and TH Heavy Engineering Bhd (THHE) are eyeing a RM220 million contract to build 18 fast interceptor craft (FIC) for the Royal Malaysian Navy (RMN) as it is likely to be the only big-ticket item that will be awarded for the armed forces over the next few months.

    Helpful(0) Unhelpful(0)You have already voted this
  8. INVESTING MALAYSIA

    5 MAR 20 – TH Heavy Engineering Bhd (THHE), together with its 80%-owned unit Floatech (L) Ltd and nine others, has been slapped with a RM74.8 million claim from Globalmariner Offshore Services Sdn Bhd for alleged fraudulent conduct involving its scheme of arrangement.

    Helpful(0) Unhelpful(0)You have already voted this
  9. BURSA MALAYSIA

    The Group recorded revenue of RM18.9 million as compared to revenue of RM22.0 million in the immediate preceding quarter. The decrease is due to a lower
    contribution from fabrication works for pile project. The Group recorded an increase in profit before tax of RM1.7 million in the current quarter 2020 as compared to a profit before tax of RM1.4 million for the immediate preceding quarter mainly due to the absence of waiver of debts as part of Scheme of Arrangement exercises and the absence of impairment loss on trade receivable.

    Helpful(0) Unhelpful(0)You have already voted this

    Add a review

    Your email address will not be published. Required fields are marked *

    klse share price, target price, profit PER estimation
    Register New Account
    Name (required)
    Reset Password
    Compare items
    • Total (0)
    Compare